What a HydroDrill borehole includes
One crew and one contract from the first survey point to a tested pump. Nothing here is an optional extra bolted on later.
Geophysical survey
We run Vertical Electrical Sounding at several points on the plot and read the results to choose the drilling point and an expected depth. On basement rock this is the step that decides whether the hole is strong or dry.
Drilling
Rotary mud through the top layers, then a down-the-hole hammer once the bit reaches fresh rock. Truck-mounted rigs, and skid rigs where a compound is too tight for a truck.
Casing and development
UPVC or steel casing through the loose ground, a gravel pack around the screens, then development until the water runs clear.
Test pumping
We pump the well and report yield and drawdown, so the pump is sized to what the hole actually gives rather than a guess.
Pump installation
Submersible pump, control panel, surge protection, pressure tank and reticulation, test-run with you before handover.
Solar, storage and treatment
Solar pumping where the grid is unreliable, storage tanks sized to daily demand, and filtration or UV sterilisation where the water needs it.
