Ground conditions and depths in Lugbe
Ground conditions change across Lugbe. The older parts sit on basement rock like the rest of AMAC, while towards the river plains you meet deeper loose material that has to be cased properly before the bit reaches anything stable. Most household boreholes finish between 50 and 90 metres.
Because the area is still filling in, we often meet boreholes drilled in a hurry: too shallow, undersized pump, no development before handover. If yours has stopped or runs dirty, we diagnose before quoting, because a silted screen, a dropped pump and a dry well are three different problems with three different answers.
For new builds on estates without reliable mains supply, the sequence matters: survey the plot before the soakaway and interlocking go in, then drill, then set the tank where it can gravity-feed the house.
Project on record
We rehabilitated a borehole in Lugbe: pump-out and development, screen cleaning, then a new pump and tank connection, with clear water running at the tap before we left.
